Industries · Data Center Construction

AI for the paperwork that runs the build.

Apolo agents point at the work that controls how fast a prototypical multi-building program gets to handoff: bid takeoffs, RFIs, submittals, and jobsite photos. Built for EPCs, general contractors, and commissioning teams.

01

The agents pointed at this work

4 agents·One catalog

Extract takeoffs, find spec gaps, classify photos, triage RFIs.

Each agent targets one specific operational workflow on a multi-building data center program. Industry rules, formats, and acceptance criteria already encoded.

Why this work

On a prototypical program, the paperwork sets the pace.

Multi-building campuses generate thousands of weekly jobsite photos, hundreds of RFIs per building, and bid packages that arrive incomplete. The same question gets re-asked across buildings, the same mistake repeats, and the teams that answer fastest run the schedule. That is document work, and it is exactly what these agents are pointed at.

In production at a multi-billion-dollar data center operatorSiteLens + RFI Insights on the same program
Does this work with Procore?

Yes. SiteLens pulls photos from Procore and direct uploads into one workspace, and the agents fit the systems you already run.

Can it compare across prototypical buildings?

That is the point. Photos group across buildings for prototypical comparison, and RFIs cluster across buildings, campuses, and design partners so repeats stop repeating.

Where does project data live?

In your environment. On-prem or customer-controlled, ISO 27001 and SOC 2 Type 2, no third-party LLM in the loop.

Talk to us

See AI on your own data center program.

Tell us which workflow is eating your team's week: jobsite photos nobody's reviewing, RFIs piling up, drawing packages with hidden risk, takeoffs that take too long. We'll show you which agent fits.

EPCs
General contractors, CxA
Multi-building
Prototypical programs